We are a leading firm engaged in the efficient manufacture of reliable and qualitative VSK Portland Cement Plants. These plants are used to manufacture clinkers on a small scale. These plants make use of raw materials such as limestone, clay, iron dust and pet coke. These plants are easy to install and operate owing to their compact size. The operational and maintenance costs of these plants are also low. The plant is divided into three sections such as the raw mill section, kiln section and the clinker grinding section.

Features:

  • Easy to install

  • Low operational costs

  • Easy to maintain

VSK Portland Cement Plants

FOB Price : Get Price

The VSK technology is used for the production of small-scale clinkers. The equipment is small and easy to operate.
Raw material:
S .No. Raw Material Percentage
1. Lime Stone 71-72
2. Clay (Black Soil) 16-18
3. Pet Coke 8
4. Iron dust 1% if required
The VSK technology is used for the production of small-scale clinkers. The equipment is small and easy to operate. Raw materials:
The process is divided into 3 stages:
Raw materials :
raw grinding section
furnace section
Section Crushing clinkers
1. Section grinding to believe:
All raw materials must have a dimension of 25 mm. If the dimension of the raw material is larger than 25 mm, it must be crushed in a crusher and a hammer mill. All raw materials are crushed is stored in tank farms by discharge conveyors.
Now, the raw materials are transported in accordance with their required percentage, with the help of belt feeders (certificate by PLC). The measured materials are sent to power the belt conveyors and after they are moved, in an elevator in a feed hopper. Power to the material is controlled with the help of a feeding / Feed table ratchet.
2. Section four:
The storage silo the mixed raw materials are transported to a nebulizer using a screw conveyor. Then water is sprayed on the mixture (10%) for that produce nodules with using of the nebulizer. These nodules are introduced into the furnace through the feed chute to achieve combustion and Fusion. The temperature rises to 1350oC in the combustion zone. The material advance very slowly in the oven. Inside, all the material fuses. After having passed through the combustion zone material slowly starts to cool. The sintering process begins and finally the clinker out of the oven.

 
RELATED PRODUCTS
 
X
Convenient
Competitive Quotes
Choice of Suppliers
 
sending enquiry ....

unable to instantiate your call right now. please try after some time.

close

©Copyright HelloTrade.com