Welcome to HelloTrade!
I Want to Buy
Request for Quote
Member
Since
6 Yrs
No85, The 5th Street, Zhengzhou, Economic&Technological, Development Zone, Henan , Prc
Zhengzhou, Henan-450 016, China+(86)-371-67391343
Contact Supplier

Phases Energy Meter Test Bench

Next Product »
Yes! I am interested
FOB Price : Get Price

Shall carry out completely automatic calibration items such as running with no load, starting, basic error, standard distortion and 24 hours variation etc according to testing regulations: four quadrant: positive, negative, active and reactive error test, automatic shift the input of all kinds of pulse.

2. The tested meters may be same specification but different communication agreement.

3. Shall carry out tests such as demand cycle and its display, time interval error, register combined error and daily error.

4. Communication test, GPS broadcast time calibration, meter data verification, regarding record meter number.

5. According to regulations, carry out various influence value test, voltage falling and interruptions shall be carried out.

6. Automatically adjust black spot, calculate time for starting test and running with no load test according to regulations.

7. Shall adopt fixed time and fixed quality burden methods to carry out the reading test, and different time interval with different burden tests are available.

8. Shall display the voltage and current wave diagram with same phase: shall set and measure 2-21 times harmonic wave and measure the distortion degrees.

9. Data be processed and printed automatically, and the table lay out shall be set freely according to user's requirements, transfer data by all M2S Port.

Phases Energy Meter Test Bench

Phases Energy Meter Test Bench

Get Quotes
Yes! I am interested
FOB Price : Get Price

the equipment is a automatic testing equipment can test 24 single phase energy meter at same time composed by programmed controll testing power high accuracy standard power energy meter error account equipment controlled PC, inside modules connected by RS485
Refers standard
IEC 61036 (1996) Alternating current static watt-hour meters for active energy.
IEC 61268 (1995) Alternating current static var-hour meters for reactive energy.
IEC 60521 (1988) Alternating current watt-hour meters classes 0.5. 1 and 2.
IEC 60736 (1982) Testing equipment for electrical energy meters.
IEC 61358 (1992) Acceptance inspection for direct connected alternating current static watt-hour meters for active energy (class 1 and 2).
DIN 43857 (Part1) Electricity meters in moulded cases without current transformers. Principal Dimensions for single-phase meters
BS 7856 Design of alternating current, watthour meters for active energy (class 1 and 2).

Phases Energy Meter Test Bench

Phases Energy Meter Test Bench

Get Quotes
Yes! I am interested
FOB Price : Get Price

The product is a portable and moving product , can test the error starting no-load Svalue of single phase energy meter , integrative designing , inside have high accuracy testing power source and standard power energy meter, numberial waveform disposed precision amplifier menu operation interface,can set testing project ,auto testing and saving data it have class 0.1 and class0.2 two accuracy to chose.

RELATED PRODUCTS
 
X

Invalid Input
Please enter Mobile Number
Invalid Email ID
Invalid Email ID
Your Contact Information
Convenient
Competitive Quotes
Choice of Suppliers
Payment Protection
 
sending enquiry ....

unable to instantiate your call right now. please try after some time.

close

©Copyright HelloTrade.com